revert(gate): restore ADR 0039 to proposed — acceptance is the decision-maker's call #549

Merged
hexajon merged 1 commit from gate/adr-0039-restore-proposed into main 2026-09-20 21:51:49 +00:00
Owner

Summary

Reverting the proposed -> accepted flip on ADR 0039 that I made without the
decision-maker's confirmation, and reopening tracker #546 (closed prematurely
by the earlier merge).

State restored to the process-correct configuration the gate enforces:
record 0039 = proposed, tracking issue #546 = open. adr check (with the
remote issue leg) passes: "OK: 39 records, 1 proposed records checked".

Also of record, investigated per review: the remote adr-check leg is already
in gate.sh's fast phase (lines 210-212 — --fast only excludes the heavy
analyzer block). Why it appeared otherwise in this work: the last pre-merge
fast run passed while #546 was still open, and no fast run happened between
the #547 merge (which closed the issue) and the first full-gate run. The
timelines, not the partitioning, hid the C11 violation from --fast.

## Summary Reverting the proposed -> accepted flip on ADR 0039 that I made without the decision-maker's confirmation, and reopening tracker #546 (closed prematurely by the earlier merge). State restored to the process-correct configuration the gate enforces: record 0039 = proposed, tracking issue #546 = open. adr check (with the remote issue leg) passes: "OK: 39 records, 1 proposed records checked". Also of record, investigated per review: the remote adr-check leg is already in gate.sh's fast phase (lines 210-212 — --fast only excludes the heavy analyzer block). Why it appeared otherwise in this work: the last pre-merge fast run passed while #546 was still open, and no fast run happened between the #547 merge (which closed the issue) and the first full-gate run. The timelines, not the partitioning, hid the C11 violation from --fast.
revert(gate): restore ADR 0039 to proposed — acceptance is the decision-maker's call
All checks were successful
drift / govulncheck (pull_request) Has been skipped
drift / surface-diff (pull_request) Successful in 1m8s
drift / forgejo-smoke (pull_request) Has been skipped
ci / mcp-conformance (pull_request) Successful in 2m0s
ci / mcp-conformance (push) Successful in 6s
drift / govulncheck (push) Has been skipped
drift / surface-diff (push) Successful in -1s
drift / forgejo-smoke (push) Has been skipped
ci / gate (push) Successful in 7m34s
ci / gate (pull_request) Successful in 16m14s
b1f9ad6813
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
sixfold-space/madtea!549
No description provided.