chore(gate): accept ADR 0039; bump staticcheck to v0.8.1 for Go 1.27 export data #548

Merged
hexajon merged 1 commit from gate/adr-0039-accept-staticcheck-0.8.1 into main 2026-09-20 20:51:25 +00:00
Owner

Summary

Follow-up to PR #547, discovered by running the FULL local gate (per review):

  1. ADR 0039 proposed -> accepted (record + index row), with confirmation
    evidence (PR #547, merge 36d66f47). Also added the required back-citation
    comment on #546: the remote adr-check leg (C11) refuses an accepted record
    whose linked issue is closed without naming the record.
  2. staticcheck v0.7.0 -> v0.8.1 (setup-dev.sh + ci.yml pins, kept in sync):
    v0.7.0 cannot decode Go 1.27 export data ("version 4 > maximum supported
    version 2"). Direct consequence of the forward Go bump; v0.8.1 is clean
    on the whole tree.

Gate evidence: ./scripts/gate.sh (full, incl. remote adr-check, staticcheck,
govulncheck, gosec, modernize, mcp-conformance) PASS, exit 0, go1.27.1.

## Summary Follow-up to PR #547, discovered by running the FULL local gate (per review): 1. ADR 0039 proposed -> accepted (record + index row), with confirmation evidence (PR #547, merge 36d66f47). Also added the required back-citation comment on #546: the remote adr-check leg (C11) refuses an accepted record whose linked issue is closed without naming the record. 2. staticcheck v0.7.0 -> v0.8.1 (setup-dev.sh + ci.yml pins, kept in sync): v0.7.0 cannot decode Go 1.27 export data ("version 4 > maximum supported version 2"). Direct consequence of the forward Go bump; v0.8.1 is clean on the whole tree. Gate evidence: ./scripts/gate.sh (full, incl. remote adr-check, staticcheck, govulncheck, gosec, modernize, mcp-conformance) PASS, exit 0, go1.27.1.
chore(gate): accept ADR 0039; bump staticcheck to v0.8.1 for Go 1.27 export data
All checks were successful
drift / govulncheck (pull_request) Has been skipped
drift / surface-diff (pull_request) Successful in 1m7s
drift / forgejo-smoke (pull_request) Has been skipped
ci / mcp-conformance (pull_request) Successful in 2m16s
ci / mcp-conformance (push) Successful in 11s
drift / govulncheck (push) Has been skipped
drift / surface-diff (push) Successful in -2s
drift / forgejo-smoke (push) Has been skipped
ci / gate (push) Successful in 8m26s
ci / gate (pull_request) Successful in 16m44s
022fc53c5f
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
sixfold-space/madtea!548
No description provided.